Logo
Login Sign Up
Current Revision

IEEE 400.3-2022

IEEE Guide for Partial Discharge Testing of Shielded Power Cable Systems in a Field Environment
Best Price Guarantee
Instant

$84.00

2-5 Days

$104.00

SAVE 10%

$169.20


Sub Total (1 Item(s))

$ 0.00

Estimated Shipping

$ 0.00

Total (Pre-Tax)

$ 0.00


View in Library
or
Revision Standard - Active. The diagnostic testing of new or service-aged, installed shielded power cable systems, which include cable, joints, and terminations, using electrical partial discharge (PD) detection, measurement, and location is covered by this guide. PD testing, which is a useful indicator of insulation degradation, may be carried out online or by means of an external voltage source. The testing of compressed gas insulated cable or termination systems is not covered by this guide.
This guide covers the diagnostic testing of new or service-aged, installed shielded power cable systems, which include cable, joints, and terminations, using electrical partial discharge (PD) detection, measurement, and location. PD testing, which is a useful indicator of insulation degradation, may be carried out online or by means of an external voltage source. This guide does not cover the testing of compressed gas insulated cable or termination systems
This guide describes diagnostic methods capable of detecting and locating PD from defects and damage in installed shielded power cable systems. The results of PD tests can be used to assess the condition of cables and accessories.
SDO IEEE: Institute of Electrical and Electronics Engineers
Document Number 400.3
Publication Date May 15, 2023
Language en - English
Page Count 63
Revision Level
Supercedes
Committee Insulated Conductors
Loading...

Failed to load document history.

Publish Date Document Id Type View