IEEE 2420-2019

Current Revision
IEEE Standard Criteria for Combustion Turbine-Generator Units Applied as Standby Power Supplies for Nuclear Power Generating Stations

Best Price Guarantee Published: Jun 18, 2020 en - English 44 Pages

Sub Total (1 Item(s)) $ 0.00
Estimated Shipping $ 0.00
Total (Pre-Tax) $ 0.00
View in Library
or
Institute of Electrical and Electronics Engineers Logo

IEEE Standard Criteria for Combustion Turbine-Generator Units Applied as Standby Power Supplies for Nuclear Power Generating Stations

PUBLISH DATE 2020
PAGES 44
New IEEE Standard - Active. The criteria for the application and testing of combustion turbine-generator units as Class 1E standby power supplies in nuclear power generating stations are described in this standard.
This standard describes the criteria for the application and testing of combustion turbine-generator units as Class 1E standby power supplies in nuclear power generating stations. Figure 1 shows the boundaries of systems and equipment included in the scope of this standard. Site testing is covered in Clause 7, and the boundaries for site testing are given in 1.1.2.
The purpose of this standard is to provide the principal design criteria, design features, testing, and qualification requirements for the individual combustion turbine-generator units that enable them to meet their functional requirements as a part of the standby power supply under the conditions produced by the design basis events cataloged in the Plant Safety Analysis.
Loading...

Failed to load document history.

Publish Date Document Id Type View