IEEE 1248-2020

Current Revision
IEEE Guide for the Commissioning of Electrical Systems in Hydroelectric Power Plants

Best Price Guarantee May 5, 2020 English 155 Pages

Sub Total (1 Item(s)) $ 0.00
Estimated Shipping $ 0.00
Total (Pre-Tax) $ 0.00
View in Library
or
Institute of Electrical and Electronics Engineers Logo

IEEE Guide for the Commissioning of Electrical Systems in Hydroelectric Power Plants

PUBLISH DATE 2020
PAGES 155
Revision Standard - Active. Inspection procedures and tests for use following the completion of the installation of components and systems through to commercial operation are provided. This guide is directed to plant owners, designers, and contractors involved in the commissioning of electrical systems of hydroelectric plants.
This guide describes tests performed and provides processes to be followed during the commissioning of electrical and control systems in hydroelectric plants. Guidance for methods to be used, organization, and execution of the testing are provided. While the guide does not provide prescriptive procedures that are plant and equipment specific, tests are described along with reference standards for more information. The commissioning of electrical equipment may be for a new hydroelectric plant installation; rehabilitation of an existing hydroelectric plant; or replacement and upgrade of existing electrical equipment.
This guide is directed to hydroelectric plant owners, operators, designers, and contractors involved in the commissioning of electrical equipment and systems of hydroelectric plants. This guide suggests inspections and tests to be used following the completion of the installation of components and systems through commercial operation. Minor adaptions may be required for particular corporate structures and philosophies.
Loading...

Failed to load document history.

Publish Date Document Id Type View