AWWA C602-17

Current Revision
Cement-Mortar Lining of Water Pipelines in Placeβ€”4 In. (100 mm) and Larger

Best Price Guarantee Published: Jan 1, 2017 en - English 32 Pages

Sub Total (1 Item(s)) $ 0.00
Estimated Shipping $ 0.00
Total (Pre-Tax) $ 0.00
View in Library
or
American Water Works Association Logo

Cement-Mortar Lining of Water Pipelines in Placeβ€”4 In. (100 mm) and Larger

PUBLISH DATE 2017
This standard describes the requirements for the materials and application of a cement-mortar lining to the inside surface of 4-in. (100 mm) and larger new and old steel, ductile-iron, and cast-iron water pipelines that have been previously installed, as well as related work. The application requirements are that the lining of straight pipe sections and long radius bends shall be performed by a machine that progresses uniformly through the pipe, applies cement mortar against the pipe surfaces, and is provided with an attachment for mechanically troweling the mortar to obtain a smooth lining of uniform thickness with smooth transitions over joints; and, that the lining of bends, specials, and areas adjacent to valves shall be machine sprayed and hand troweled or, where machine placement is impractical, shall be performed manually. This digital download is subject to AWWA’s Single User License Agreement. Multi-user licenses are also available by contacting us. Learn more about AWWA’s digital downloads including frequently asked questions.
Loading...

Failed to load document history.

Publish Date Document Id Type View