Logo
Login Sign Up
Current Revision

ACI 364.8-22

Hydrodemolition for Concrete Removal in Unbonded Post-Tensioned Systems—TechNote:
Best Price Guarantee
Instant

$19.00

2-5 Days

$19.00

SAVE 30%

$26.60


Sub Total (1 Item(s))

$ 0.00

Estimated Shipping

$ 0.00

Total (Pre-Tax)

$ 0.00


or
...
Should hydrodemolition be used to remove concrete in structural elements with unbonded post-tensioned systems? Keywords: anchorage; concrete removal; corrosion; demolition; high-pressure water jetting; hydrodemolition; microcracking; post-tensioning; repair; sheathing.
SDO ACI: American Concrete Institute
Document Number 364.8
Publication Date Jan. 1, 2022
Language en - English
Page Count
Revision Level
Supercedes
Committee
Publish Date Document Id Type View
Jan. 1, 2022 ACI 364.8-22 Revision