ACI 351.5M-15

Current Revision
Specification for Installation of Epoxy Grout between Foundations and Equipment Bases (Metric)

Best Price Guarantee Published: Jan 1, 2015 en - English 12 Pages

Sub Total (1 Item(s)) $ 0.00
Estimated Shipping $ 0.00
Total (Pre-Tax) $ 0.00
View in Library
or
American Concrete Institute Logo

Specification for Installation of Epoxy Grout between Foundations and Equipment Bases (Metric)

PUBLISH DATE 2015
This specification covers minimum requirements for epoxy grouting between foundations and equipment bases. Included are requirements for materials, placement, and quality control. Keywords: epoxy grout; foundations; grout.
Loading...

Failed to load document history.

Publish Date Document Id Type View