Logo
Login Sign Up
Current Revision

ACI 336.1-01

Specification for the Construction of Drilled Piers
Best Price Guarantee
Instant

$34.50

2-5 Days

$34.50

SAVE 30%

$48.30


Sub Total (1 Item(s))

$ 0.00

Estimated Shipping

$ 0.00

Total (Pre-Tax)

$ 0.00


View in Library
or
American Concrete Institute Logo

ACI 336.1-01

Specification for the Construction of Drilled Piers

PUBLISH DATE 2001
ACI 336.1-01
This specification covers requirements for drilled pier construction. It included delivery, handling and storage of the casing, excavation, soil testing, placing of concrete and reinforcing steel and inspection. Drilled piers are sometimes called drilled shafts, caissons, or bored piles. Keywords: bored pile; caisson; concrete; drilled pier; foundation; placing; reinforced concrete; reinforcement; slurry; soil; specification; test; tolerance.
SDO ACI: American Concrete Institute
Document Number 336.1
Publication Date Jan. 1, 2001
Language en - English
Page Count 22
Revision Level
Supercedes
Committee
Loading...

Failed to load document history.

Publish Date Document Id Type View